The first stage of the construction of SW Park in Skawina assumed the construction of free-standing parallel railings, two pull-up bars 1.4 and 1.8 m wide at a height of 2.2 and 2.5 m above the ground level and a standard vertical ladder and a horizontal ladder supported by a tubular pole to the so-called flag. The facility is located in the western part of the City Park in Skawina, on one of the bends of the Skawinka river. Wood bark was used as a surface.
15x12m
(180 m2)1.5 m
7 people
120 kg
,,