The largest of the parks focused on Street Workout completed by July 2014 was built on the premises of CSiR in Płońsk at ul. Kopernika 3. The park design is a version of the squares in Rzeszów, Zgorzelec and Zdzieszowice, expanded by an additional 5 bars. Therefore, it consists of a vertical and horizontal ladder, sets of double and single bars of various heights, an inclined bench and a set of parallel high and low handrails. As the surface, as in the first and second park in Bemowo in Warsaw, perforated rubber mats were placed on mechanically hardened ground.
11x11m
(121 m2)1.5 m
20 people
120 kg
,,